Adjunct Professor Curtis Bennett on Dangers of FortisBC’s Smart Meters Affecting Pacemakers, Building Code Compliance, Adverse Health Effects, Economy, Etc Speaks for Kelowna Safe Meter’s

Kelowna Safe Meters is a Non Profit Citizen’s Group concerned about the mass deployment of wireless smart meters when citizens have not been duly informed.

Professor Curtis Bennett was asked to present and answer any questions from the audience. Bennett is an Interprovincial Journeyman Electrician, Building Construction Engineering Technologist, Thermal Radiation Consultant since 1979 and an Adjunct Professor lecturing Continuing Medical Education Programs where health professionals get education credits required for ongoing medical licensing. Non Thermal issues can be seen with non invasive radiology.

Safety Code 6 is Health Canada’s Exposure Code for RF EMF and Limits of Human Exposure. It is the only code admitting causality and biological plausibility was missing linking RF EMFs to adverse health effects.

Bennett was the Canadian Government’s Electrical Professional reporting causation to Health Canada September, 2010 and at the request of Canadian Parliament October, 2010.

Bennett lectured causation for accredited medical education January, 2011 meaning it is no longer opinion but approved and accepted medical education now.

Bennett was on Texas PUC’s Expert Panel on Smart Meters in 2012, provided evidence for Texas Senate Committee, Declarations for Oregon and Michigan Courts under threat of Perjury.

Bennett was a Registered Intervener in the FortisBC application for wireless smart meters and cross examined FortisBC experts in front of the BC Utilities Commission. Bennett technically disqualified FortisBC experts under direct cross examination. Radio Interviews with Bennett admitting science doesn’t pick sides, I am there in the best interests of all parties including utilities. Bennett warned FortisBC and the BCUC about the liability and was administratively dismissed, not technically disqualified. Here are links to letters including transcripts of the BC Government which is a legal precedent. FortisBC experts admitted critical science was missing in their Risk Assessment Report and Electrical Engineer for Exponent Inc Yakov Shkolnikov stated under oath it would be his duty as an electrical engineer to revise his reporting but that didn’t happen. Shkolnikov stating Exponent Inc carried his Errors and Omission’s Insurance puts the company on the hook for significant damage that will be in the trillions.

Listen to the presentation and see the plastic head used by FortisBC and others to substantiate safety. FortisBC as one example is using a human exposure code to bypass Building Codes when it isn’t even applicable. Buildings across Canada will be non compliant with Building Code 4.1.3.6.(Vibration) making smart meters illegal across Canada today.

Bennett is electrically substantiating medical reporting of harm. This is applicable in the US as well as around the world. The Specific Absorption Rate is baseless science but an admission of guilt and the smart meters will not save 1 watt of the energy they are supposed to address.